Barrel

Testing

Boiler fittings

Grate

Building a Clayton 2" Scale Steam Wagon

designed by Robin Dyer

built by Tony Simons



Taking a measurement before the test
Taking a measurement before the test
177.24mm
177.24mm
Small leak
Small leak
Pressure connection
Pressure connection
15 Bar pressure
15 Bar pressure
Dry
Dry
No leaks!
No leaks!
177.28mm after pressurising
177.28mm after pressurising

Boiler testing

A new boiler needs a shell test, hydraulic testing to 200 psi, which is twice working pressure. I took it up to 50psi and I found a small leak around one of the tubes, I re-flowed the silver solder and retested gradually taking the pressure up to 200psi. I held it there for 20mins. The boiler grew in diameter by 0.04mm.

The video shows a small leak!